Laser Production Time Calculator

Estimate the cycles, machine minutes and handling time for a batch.

Worked example

Schedule an order of 50 pieces that runs six pieces at a time.

  1. Enter 50 total pieces and six pieces per cycle.
  2. Enter four minutes of machine time and one minute of handling per cycle.
  3. Add 15 minutes of one-time setup.

Expected result

The order takes nine cycles, with two pieces in the last cycle. It requires 36 minutes of machine time and 60 minutes including handling and setup.

Why does the last partial cycle count as a full cycle?

This is a conservative schedule. If a partial run is measurably faster, account for the time difference separately.

Using your result

Use a timed test run to estimate machine minutes per cycle. Add loading and unloading time separately.

The final partial cycle is budgeted at the full cycle duration. Use measured values when committing a production schedule.

Carry the estimated machine minutes into the Engraving Price Calculator.